    "name": "First-fix inspection",
    "summary": "Before plasterboard: structure and openings, first-fix plumbing and electrics, insulation, fire stopping, ventilation.",
    "sections": [
      {
        "room": "Structure and openings",
        "checks": [
          {
            "text": "Studs, noggins and pattresses in for radiators, basins, cabinets and TVs",
            "category": "structural"
          },
          {
            "text": "Lintels bearing correctly; cavity trays and stop ends over openings",
            "category": "structural"
          },
          {
            "text": "Window and door frames plumb, fixed, cavity closers fitted",
            "category": "finishing"
          },
          {
            "text": "Floor joists strutted; no over-notching for services",
            "category": "structural"
          }
        ]
      },
      {
        "room": "First-fix plumbing",
        "checks": [
          {
            "text": "Pipework clipped, sleeved through walls, pressure-tested",
            "category": "plumbing"
          },
          {
            "text": "Waste and soil runs to fall, vented, tested",
            "category": "plumbing"
          },
          {
            "text": "Underfloor heating loops laid and pressure-held, if specified",
            "category": "mechanical"
          },
          {
            "text": "Boiler flue route and condensate drain agreed",
            "category": "mechanical"
          }
        ]
      },
      {
        "room": "First-fix electrical",
        "checks": [
          {
            "text": "Back boxes at correct heights and counts; cables clipped in safe zones",
            "category": "electrical"
          },
          {
            "text": "Cables not crossing joists unprotected; grommets in metal boxes",
            "category": "electrical"
          },
          {
            "text": "Smoke, heat and CO detector positions wired",
            "category": "safety"
          },
          {
            "text": "Data, TV and speaker cables pulled",
            "category": "electrical"
          }
        ]
      },
      {
        "room": "Insulation and vapour control",
        "checks": [
          {
            "text": "Insulation continuous, no gaps at studs and around boxes",
            "category": "finishing"
          },
          {
            "text": "Vapour control layer on the warm side, lapped and taped",
            "category": "finishing"
          },
          {
            "text": "Acoustic insulation in party and floor voids",
            "category": "finishing"
          }
        ]
      },
      {
        "room": "Fire stopping",
        "checks": [
          {
            "text": "Service penetrations through fire walls and floors stopped with a tested system",
            "category": "safety"
          },
          {
            "text": "Cavity barriers at floor lines, party walls and around openings",
            "category": "safety"
          },
          {
            "text": "Fire stopping photographed before it is covered",
            "category": "safety"
          }
        ]
      },
      {
        "room": "Ventilation",
        "checks": [
          {
            "text": "Extract ducting rigid where possible, sealed, routed to outside",
            "category": "mechanical"
          },
          {
            "text": "MVHR ducts labelled, insulated in cold spaces, terminals located",
            "category": "mechanical"
          },
          {
            "text": "Trickle vents or background ventilation as designed",
            "category": "mechanical"
          }
        ]
      }
    ]
  }
}